Three tools for the people who actually run civil jobs — the four-week look-ahead, the daily cost position, and the layer tying them together. Each one started as a spreadsheet we got sick of on a live site.
The next four weeks, owned — without opening the contract programme. Plan at the work-area level, status it weekly, share it with subbies.
Real cost control for construction. Built for the people on site, with one seamless workflow.
An agentic operating system for construction businesses — the layer that ties the tools and workflows together.
Short-range planning for the people running the work — plan at the work-area level, status it weekly, share it with subbies. No contract programme required.
Every feature has to earn its place against three rules. If it can’t, it doesn’t ship. We’d rather have fewer well-fitting features than many half-baked ones.
Every feature has to demonstrate a time saving. Capture it once, no double handling.
Site teams run the work on office tools forced onto the field. Ours is built for construction — for how a site actually runs.
Reporting is only as accurate as the feedback from site. We bridge that gap — so the number captured in the mud is the number the manager reports.
Delta brings cost control to the same projects — docket capture, coded cost tracking, and forecast-to-complete, landing late 2026. Roadmap OSis the agentic layer tying every tool and workflow into one connective system, white-label-able to other construction companies. Leave an email and we’ll bring you in as each one opens up.