The four-week look-ahead, run by your engineers — not a spreadsheet.
One source of truth: automated Daily Planner and Bookings, with Roadblocks surfaced early.

The Baseline look-ahead isn’t a static plan — it’s your planning engine, live. Change it once and everything downstream follows: dates, bookings and the daily planner.
The program, collapsed into today. Due, overdue and closed at a glance — with every roadblock, material, subcontractor and conformance owned and dated, so nothing slips between weekly updates.


Every blocker — materials, RFIs, NCRs, approvals — surfaced, owned and dated. Tracked from raised to resolved, with the overdue ones impossible to ignore.

Every supplier booking — materials, plant, subcontractors — drafted, confirmed and tracked. From request to delivery, with the unconfirmed ones surfaced before they bite.
Excel tracks, P6 and Asta schedule. None of them run a site week.
Baseline covers the whole four-week loop and automates most of it.
| Capability | Baseline | |||
|---|---|---|---|---|
| Predecessor graph (multi-pred, governing rule) | — | |||
| Working-day calendars (3-layer) | — | |||
| Project-specific rosters | — | — | — | |
| Slip cascades automatically | — | |||
| Critical path highlighted in one click | — | |||
| Materials & productivity per activity | — | — | — | |
| Bookings, Roadblocks & Daily Planner auto-populated from the program | — | — | — | |
| Subbie-filtered PDF export | — | — | — | |
| Key-milestone slip flagged in the report | — | — | — | |
| Weekly report flags what needs action | — | — | — | |
| Real-time multi-user editing | — | — |